Unknown height. Generic low-rise drawing: this building's height is not measured yet.
ACADIA·condoData refreshed 2026-11-14
Sierras of Heritage (estimated name)
8535 BONAVENTURE DR SE, Calgary
- Built 1999The year the City record gives for the building's construction. Where the City has no year, the page says Unknown rather than guessing. Methodology.
- 96 unitsHow many residential units the City record lists for this address. A resident correction replaces the City figure when a verified representative confirms a different count. Methodology.
- Construction unknownThe likely construction type, estimated from the storey count and the year built under the Alberta Building Code rules in the methodology. A moderator-confirmed value replaces the estimate. Methodology.
- 0 short-term rental licencesThe number of active short-term rental licences the City has issued at this address. An address with no licence cannot lawfully offer short-term rentals. Methodology.
96 unitsHow confident the site is in the unit count: a resident correction, a National Address Register estimate, a plain City roll count, or unknown. The label travels with the number everywhere it appears. Methodology.
- unit count source: city_assessment
- unit count: 96
The storey count is an estimate from the building's LiDAR height divided by 3.1 m per storey, so a short or tall floor plan can shift it by one. It is labelled "estimated" wherever it appears. Methodology.
The construction class is estimated from the storey count and year built under Alberta Building Code rules, not published by the City. A moderator-confirmed value replaces the estimate. Methodology.
- year built: 1999
- class: unknown
1. Assessed valueThe value the City places on each property each roll year, used to set property taxes. For a condo building the page shows the median of its unit roll values; for a rental building, the total. Methodology.
Source: assessment_current. Last refreshed: 2026-11-14. Method
Source: assessment_history. Last refreshed: 2026-11-14. Method
Median unit value rose 49% from 2023 to 2025 ($260 500 to $389 500), after falling 33% from its 2025 peak. ACADIA condos rose 61%; Calgary condos rose 51%.The change in the building's median unit assessed value over the last two roll years, with the community and city changes for comparison. It is arithmetic on City assessment records, not a prediction. Methodology.
- value now: 389250
- value 2y: 260500
- value peak: 389250
- peak year: 2025
- community change 2y: 60.61643835616438
- city change 2y: 51.35135135135135
- year: 2025
- community: ACADIA
At $389 500, this building's median unit sits higher the ACADIA condo median ($234 500) and higher the Calgary median ($308 000).Where the building's median unit value sits against its community median and the Calgary median. "Near" means within 5 percent. Methodology.
- value now: 389250
- community median: 234500
- city median: 308000
- community: ACADIA
- 2025: $389,250 median unit assessed value
- 2024: $305,000 median unit assessed value
- 2023: $260,500 median unit assessed value
- 2022: $254,750 median unit assessed value
- 2021: $257,500 median unit assessed value
- 2020: $265,250 median unit assessed value
- 2019: $282,500 median unit assessed value
- 2018: $291,500 median unit assessed value
- 2017: $299,250 median unit assessed value
- 2016: $323,000 median unit assessed value
- 2015: $320,000 median unit assessed value
- 2014: $287,250 median unit assessed value
- 2013: $276,500 median unit assessed value
- 2012: $275,500 median unit assessed value
- 2011: $292,750 median unit assessed value
- 2010: $262,250 median unit assessed value
- 2009: $303,500 median unit assessed value
- 2008: $322,750 median unit assessed value
- 2007: $287,000 median unit assessed value
- 2006: $189,250 median unit assessed value
- 2005: $179,750 median unit assessed value
2. PermitsCity records of approved construction and trade work at this address: building, development, plumbing and gas permits. A permit's status tells you whether work was approved, finished, allowed to lapse or is still being reviewed. Methodology.
Source: permits. Last refreshed: 2026-11-14. Method
Source: development_permits. Last refreshed: 2026-11-14. Method
Source: plumbing_permits. Last refreshed: 2026-11-14. Method
Source: gas_permits. Last refreshed: 2026-11-14. Method
- 3Completed
- 7Expired or cancelled
No permits are open. Last completed: building permit BP1999-11759 (26 Oct 1999), described as "+15 Walkway between apartment buildings".The count of open permits and the most recently completed permit at this address. Open means the City issued the permit and the work is not reported finished. Methodology.
- open permits: []
- latest completed: {"permit_type":"building","permit_number":"BP1999-11759","issued_date":"1999-10-26","description":"+15 Walkway between apartment buildings"}
6 permits predate this building (built 1999) and belong to the site.Permits issued before the building's construction year describe work on the site under a previous building. They belong to the address, not to the current building. Methodology.
- year built: 1999
- permits before build: 6
2025
2025-11-19: building permit BP2025-22329, Single Family, Improvement, described as "Addition"Expired or cancelled
2008
2008-07-23: development permit DP2008-2354, Residential - Multi-Family - Renovations, described as "ADDITION: MULTI-RESIDENTIAL DEVELOPMENT (SUNROOM - 2 YEARS)"Expired or cancelled
2003
2003-04-15: development permit DP2003-1098, described as "CONVERTED JOB -REVISION TO DP1997-3993 APARTMENT"Expired or cancelled
1999
1999-10-26: building permit BP1999-11759, Apartment, Improvement, described as "+15 Walkway between apartment buildings", estimated cost $35 000, contractor MEDICAN CONSTRUCTIONCompleted
1997
1997-12-19: development permit DP1997-3993, described as "CONVERTED JOB - APARTMENT"Completed
1996
1996-09-06: development permit DP1996-2497, described as "CONVERTED JOB - SURFACE PARKING LOT"Expired or cancelled
1991
1991-06-18: development permit DP1991-1451, described as "CONVERTED JOB - PARKING LOT AT GRADE (FOR ONE YEAR)"Expired or cancelled
1989
1989-12-07: development permit DP1989-3061, described as "CONVERTED JOB - SURFACE PARKING LOT RENEWAL DP88/2525"Expired or cancelled
1982
1982-05-07: development permit DP1982-0663, described as "CONVERTED JOB - ADDITION TO RECREATION CENTRE"Expired or cancelled
1981
1981-11-02: development permit DP1981-2177, described as "CONVERTED JOB - 376 UNIT APARTMENT (CONDOMINIUM) & COMMERCIAL BUILDING"Completed
3. Assessment appealsA property owner can appeal the City's assessment of their property to an independent review board. These are the recorded outcomes for this building, with the City's spelling of the outcome normalized. Methodology.
Source: appeals. Last refreshed: 2026-11-14. Method
- 2025: Resolved without hearing
- 2016: No Change
2 appeals in 15 years (1 Resolved without hearing, 1 No Change); the median Calgary condo building has 0.How many assessment appeals this building has had in 15 years, against the median for Calgary buildings of the same type. An appeal is not evidence the assessment was wrong; most are resolved without changing it. Methodology.
- appeals 15y: 2
- city median appeals 15y: 0
- appeals outcomes: [{"outcome":"Resolved without hearing","count":1},{"outcome":"No Change","count":1}]
- building type: condo
4. Community context: ACADIAThese figures describe the whole community, not this building. They come from City records aggregated by community boundary. Methodology.
About the community, not this building
Source: community_stats_1. Last refreshed: 2026-11-14. Method
Source: community_stats_2. Last refreshed: 2026-11-14. Method
ACADIA logged 3 154 service requests in the last 12 months: 318.1 per 1,000 residents and 62.5 per 100 dwellings, higher than 55% of Calgary communities per 1,000 residents.The community's City service requests over the last 12 months, normalized per 1,000 residents and per 100 dwellings so communities of different sizes can be compared. The percentile says where the community sits among Calgary communities with at least 1,000 residents. Methodology.
- total 12m: 3154
- population: 9915
- dwellings: 5046
- percentile per 1000: 55
- percentile per 100dw: 34
- community: ACADIA
The most common requests were Waste and Recycling Services (21%), Roads (21%) and Bylaw (13%).The three largest categories of the community's service requests, by share of the 12-month total. Categories are the City's own service names, grouped by their prefix. Methodology.
- top categories: [{"category":"Waste and Recycling Services","share":21},{"category":"Roads","share":21},{"category":"Bylaw","share":13},{"category":"Water Services","share":11},{"category":"Parks","share":7},{"category":"Assessment","share":6},{"category":"Corporate","share":3},{"category":"Fire","share":3}]
Requests fell 1% compared with the previous 12 months.Whether the community's service requests rose or fell compared with the previous 12 months. Two years of history, not a long-run trend. Methodology.
- requests 12m: 3154
- requests prior 12m: 3171
Why a raw per-resident rate can mislead here. Downtown communities carry city-wide services, and very small communities have too few residents for a reliable rate. Methodology.
- sector: SOUTH
- population: 9915
Social disorder reports: Not available for this community; see methodology.
5. ResidentsComments from residents who have lived at or visited this building, published under the site's moderation rules. A comment is one resident's experience, not a verified fact about the building. Methodology.
No resident comments on record for this building.
6. About this dataEvery dataset this page draws from, with its City dataset id and the date the pipeline last refreshed it. The methodology page explains what each source covers and what it cannot tell you. Methodology.
- Source: appeals. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: assessment_current. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: assessment_history. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: community_profiles. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: community_stats_1. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: community_stats_2. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: development_permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: estimates. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: gas_permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: osm_names. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: plumbing_permits. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: price_series. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Source: short_term_rentals. Last refreshed: 2026-11-14. Licence: City of Calgary open licence.
- Methodology